Correctional Centre - Lara

This project comprised of a greenfield site development with 78N° buildings to house 500 prisoners, including cell blocks, laundry, administration areas, recreation and sporting facilities.

The design included fire hydrants, fire sprinkler and domestic water under ground ring mains supplied from tanks and pumps. Sewer drainage is connected to various pump wells, before discharge to the street systems.

Services provided by SPP Group include:-

  • Sanitary Plumbing and Drainage
  • Trade Waste Plumbing and Drainage
  • Cold Water
  • Hot Water
  • Backflow Prevention
  • Gas
  • Fire Hydrants and Fire Hose Reels

    Location:

    Lara, Victoria

    Client:

    Victorian Government

    Industry Sector:

    Institutional