Gatton Correctional Facility

The initial first stage of Gatton Correctional Centre will consist of a 300 bed womens and 500 bed mens correction centre.

The centre will incorporate the latest water saving technology to achieve and set the world's best practices for water usage. Some of the water saving initiatives include a blackwater treatment plant with reuse of the treated water for cooling towers, WC flushing and landscape irrigation. Stormwater harvesting will also be used in the recycled water system. A vacuum sewerage system will be used to reduce WC flushing rates from 9 litres to 1.5 litres. Gatton Correctional Centre will also include a water control system that will limit showering time and prisoner water consumption. The water management system will also measure the water consumption of each prisoner and will allow their usage to be regulated to suite water availability and the user's circumstances.

Services provided by SPP Group include:-

  • Sanitary Plumbing and Drainage
  • Trade Waste Plumbing and Drainage
  • Cold Water
  • Hot Water
  • Warm Water
  • Backflow Prevention
  • Water Management System
  • Vacuum System

Gatton Correctional Facility

Location:

Gatton

Client:

Baulderstone Pty Ltd

Industry Sector:

Correctional